STEP 14
Installation of cable 1 for latissimus (26) with cable pulley
units. Please note following situation regarding the cable
pulley units: The cables have to put on the cable pulleys
(83) and should covered on both sides with cable pulley
covers (84) that the input and output of cable is leaded.
The cable pulley units have to install at the same time
with cables at right position.
1. Put the cable 1 (26) as showed in Step 14 drawing through
the top cross beam (5), screw the screw end of cable 1 (26)
with washer 12//24 (119) into the weight disk bar (40) and
secure the screw with nut. (The cable system can be nely
adjusted on this cable screw. The rope screw must always be
screwed in at least 12mm deep and additionally countered by
the nut.)
2. Take cable 1 (26) and a cable pulley unit as showed in
gure „B" (without cable pulley cover) with screw M10x70
(112), washer 10//20 (118), plastic bushing for pulley (94) and
nut M10 (124). Insert the cable pulley (83) into the top cross
beam (5), position the plastic bushing (94) from outer side of
top cross beam (15) and screw in tightly.
3. Put a cable roller unit as gure „A" shows together with
screw M10x45 (110), washer (118) and self locking nut (124),
insert the cable 1 (26) and connect this at top cross beam (5).
4. Take cable 1 (26) and a cable pulley unit as showed in
gure „A" with screw M10x70 (112), washer 10//20 (118),
plastic bushing for pulley (94) and nut M10 (124) and attach it
at cable pulley holder 2 (6).
5. Then put the screw caps for M10 (131) onto all M10 screw
heads and nuts.
STEP15
Installation o cable 3 or buttery (29) with cable pulley
units.
1. Connect the both ends of cable 3 (29) with the appropriate
holder at buttery arm let and right (11+14).
2. Put two cable roller units as gure „A" shows together
with screw M10x45 (110), washer (118) and self locking nut
(124), insert the cable 3 (29) and connect them at cable pulley
holders 1 (8) in a way that the cable pulley can roll easy.
3. Put a cable roller unit as gure „A" shows together with
screw M10x45 (110), washer (118) and self locking nut (124),
insert the cable 3 (29) and connect this at twin cable pulley
holder (27) in a way that the cable pulley can roll easy.
4. Then put the screw caps for M10 (131) onto all M10 screw
heads and nuts.
STEP 16
Installation of cable 4 for leg curler (31) with cable pulley
units.
1. Pull cable 4 (31) through the big hole of leg curler (15)
and connect the end of cable 4 (31) at appropriate holder on
bottom side of leg curler holder (12) by using screw M10x40
(136), washer 10//20 (118) and self locking nut M10 (124) as
showed in gure „C".
2. Take cable 4 (31) and a cable pulley unit as showed in
gure „B" with screw M10x80 (114), washer 10//20 (118),
plastic bushing for pulley (95) and nut M10 (124). Insert the
cable pulley (83) with cable pulley cover (84) into the leg curler
(15) and position the plastic bushing (95) from outer side of leg
curler (15).
3. Put a cable roller unit as gure „A" shows together with
screw M10x45 (110), washer (118) and self locking nut (124),
insert the cable 4 (31) and connect this at cable pulley holder
1(8) in a way that the cable pulley can roll easy.
4. Then put the screw caps for M10 (131) onto all M10 screw
heads and nuts.
A
A
B
A
26
5
6
119
131
40
112
110
131
14
8
29
A
27
C
A
6
31
Cable 4
1190mm
23
Cable 1
B
124
131
118
26
83
94
118
94
A
124
131
84
118
84
83
118
A
124
84
118
84
83
110
118
131
Cable 3
11
A
29
A
84
83
110
118
15
131
B
B
95
114
84
118
131
C
31
118
118
31
124
131
GB
2600mm
131
2690mm
124
131
84
118
124
131
95
118
83
84
131
136