Getting started with Analysis Vibration Sensor System
From the Sensor – Permanent Installation screen select sensor that is installed
permanently. From the Orientation drop-down menu, select the orientation in
which the sensor was installed. Refer to page 35 for information on asset
orthogonal axes.
Once the mounting orientations for all permanently mounted sensors are selected,
tap Continue to finish the sensor installation process and proceed with the
permanent installation of the gateway.
Mount gateways permanently then finish Fluke Connect mobile app app process
1. Mount the gateway(s) permanently at the determined position as described in
Mount the Gateway on page 37.
2. After mounting the gateway(s) permanently, return to Fluke Connect mobile app
app to finalize the permanent installation process.
Check the Installed box in the Gateway – Permanent Installation screen, then tap
Done.
The Home screen shows the number of gateways and sensors installed and
the remaining number of commissioned gateways and sensors that still require
installation.
24