Télécharger Imprimer la page

Stryker EOLE DC Powered Support Surface Manuel D'exploitation page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
INSTALLING THE CONTROL UNIT
1. Place control unit on flat surface or suspend control unit on end of bed using attached hooks. See Fig-
ure 2 and Figure 3. Remove the plug to disconnect the device. Do not position the equipment such that
it is difficult to operate the disconnecting device.
2. Position the mattress on bed frame.
3. Connect the hose assembly between the mattress air cell and the control unit. Connect the adaptor
from control unit onto the air valve.
4. Plug the power cord and Maxfirm/Seat mode will be inflated automatically. Note: The unit will take
approximately 40 minutes to inflate the mattress. Nurse can adjust the comfort level or mode with the
patient on the initial stage.
5. After installation, make sure the flap is not folding upwards to avoid fluid seeping through mattress
cover.
NOTE
Make sure the control unit is suitable for the local power voltage and frequency.
6. Position patient on the mattress.
WARNING
Deflate before CPR or CPR could be ineffective.
To deflate mattress for CPR:
When there is an emergency to perform CPR on the patient, quickly pull the CPR strap from the mattress
to release air. The quick connector on the pump unit can be disconnected for even faster deflation. The
air cell will deflate in approximately 15 seconds. Proceed with CPR procedures.
Resetting CPR:
After CPR, re-plug CPR and make sure the CPR plug is fixed on the mattress.
www.stryker.com
All manuals and user guides at all-guides.com
Instructions
836002-5210 V3.4
Return To Table of Contents
11

Publicité

loading

Ce manuel est également adapté pour:

2871