Pin 1 = measurement input: max. 20 mA, 100 Ohm measurement resistor (load imped-
ance)
Pin 2 = max. short circuit current 15 mA, max. open circuit voltage 16 V DC or GND
Wiring diagram variant 1: Signal contact for surge protection device
Depending on the setting in the Basic menu (Signal Input submenu), the DC SPD option
(surge protection device) either outputs a warning or an error on the display. Further infor-
mation on the DC SPD option can be found in the Installation Instructions.
Wiring diagram variant 2: S0 meter
A meter for recording the self-consumption of each S0 can be connected directly to the in-
verter. This S0 meter can be positioned directly at the feed-in point or in the consumption
branch. As one of the settings on the Fronius Datamanager website, a dynamic power re-
duction can be set under the "EVU Editor" menu item (see Fronius Datamanager 2.0 Op-
erating Instructions on our website www.fronius.com)
IMPORTANT! In order to connect an S0 meter to the inverter, it may be necessary to up-
date the inverter firmware.
Requirements for the S0 meter:
-
-
-
-
-
Recommended max. pulse rate of the S0 meter:
PV output kWp [kW]
30
20
10
Description of the
The "Fronius Solar Net" LED is on:
"Fronius Solar
the power supply for data communication within the Fronius Solar Net / interface protocol
Net" LED
is OK
12
Pin 2
Must comply with the IEC62053-31 Class B standard
Max. voltage 15 V DC
Max. current when ON 15 mA
Min. current when ON 2 mA
Max. current when OFF 0.15 mA
≤ 5.5
Pin 1
Pin 2
Pin 1
Max. pulse rate per kWp
1000
2000
5000
10,000
S0 +
S0 -