Télécharger Imprimer la page

AMG 16 Mode D'emploi page 67

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 113
In order to achieve the test report results, please load the performance parameters retained
by the manufacturer and the qualified technician. They will use these parameters once
verified that, during the installation, it is possibile to reproduce the laboratory conditions.
Plumbing system connection
The connection of the boiler to the plumbing system must be made ONLY by
specialized personnel who are capable of carrying out installation properly,
in compliance with current standards in the country of installation. The
manufacturer will not be held responsible for damage to persons or things
in the event of failed operation if the aforementioned warning is not complied with. It is
mandatory to install an anti-condensate valve on the return of the system, set at 60 ° C.
The valve is not supplied with the boiler.
Closed vessel system
This product has been designed and built to work with closed vessel systems. In general, the closed
vessel system has the following expansion as the expansion vessel pre-loaded.
In addition to the expansion device, the closed vessel system must be provided in accordance with
current Italian
UNI 10412-2 (2009) by:
• safety valve
• thermostat control of the circulator
• device alarm sounds
• temperature Indicator
• pressure indicator
• audio alarm
• automatic adjustment
• safety thermostat with manual reset
• circulation system
Diagram connection boiler
A 2
A 2
WATER
RETURN
C
C
C C
The pressure relief valve (C) must always be connected to a water drain pipe. The tube must be capable
of with standing high temperature and pressure.
A1
A1
WATER
DELIVERY
11

Publicité

loading

Ce manuel est également adapté pour:

Cpc160Cpc160-auto-pa