Taking a test
3
2. Wait for the channel to fill completely
The blood drop will be drawn into the narrow channel.
The channel should fill completely.
The channel turns red and the meter will count down from
5 to 1.
Blood should not be applied on the top of the test strip or to
the top edge of the test strip.
42