Step 10: Test The System - Abus FUMO50110 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 90
Installation

Step 10: Test the system

General:
• Test the system fully.
• Check that all connected components function properly.
• Check that the system as a whole responds properly to the connected components.
• Check if the correct notifications are shown on the alarm panel and if the corresponding re-
actions are triggered.
You can also test the system when the hybrid module is open. However, do not leave
Secvest installer mode to do so.
Note
Signal strength
Installer mode -> Test -> Signal strengths -> Hybrid module
Here you can see the signal strengths of the paired hybrid module
• Signal strength of the hybrid module on the alarm panel
Received signal strength: Hybrid module ► alarm panel
• Signal strength of the alarm panel on the hybrid module
Received signal strength: Hybrid module ◄ alarm panel
78 |
EN

Publicité

Table des Matières
loading

Table des Matières