Emptying Operations - Sime Brava Slim 25 BF Manuel Pour L'utilisation, L'installation Et L'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
6.13.2

EMPTYING operations

Domestic hot water circuit:
– close the domestic hot water circuit isolation valve (prear-
ranged in installation)
– open one or more than one hot water valve to fill and bleed the
domestic hot water circuit.
Boiler:
– loosen the automatic bleed valve (3)
– close the heating circuit isolation valves (prearranged in instal-
lation)
– check that the filling valve (4) is shut-off
– connect a rubber hose to the boiler drain valve (7) and open it
– when it has fully emptied, close the drain valve (7)
– close the automatic bleed valve (3).
4
3
7
Fig. 38
71

Publicité

Table des Matières
loading

Table des Matières