Non-Scheduled Maintenance - Gaggia Milano Deco Evo Serie Mode D'emploi Et D'entretien

Masquer les pouces Voir aussi pour Deco Evo Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 78
English
Replace the lid and shift lever C3 from right to left and
allow the salted water to drain out of pipe F3 until the
water is fresh.
Shift lever D3 from right to left.
8.4

Non-scheduled maintenance

Unscheduled maintenance includes every repairing or part
replacing.
The Maintenance Technician is the only person authorized
to perform these operations.
73

Publicité

Table des Matières
loading

Table des Matières