Monogram ZV800 Instructions D'installation page 16

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WALL-MOUNTED INSTALLATION—RECIRCULATING
4
MOUNT THE HOOD
Install a wood screw
on each side of the
mounting frame
■ L ift the hood onto the mounting bracket.
■ C heck to be sure it is level.
■ I nstall wood screws through the hood and into the
wall on each side of the mounting bracket.
■ E xtend the canopy forward for better access to the
rear mounting screw holes.
■ I nstall 2 wood screws or fasteners through the
bottom of the hood into the wall.
5
SIZE AND CUT DUCT PIECE
■ H old upper air deflector with duct connector against
the ceiling.
■ M easure from the bottom of the air deflector to the
top of the hood as shown.
Reduce that dimension by
1" to facilitate installation.
The duct will cover and
overlap the deflector and
the hood outlets.
16
Installation Instructions
Mounting
bracket
Install bottom
mounting screws
Duct length
Measure
length
5
SIZE AND CUT DUCT PIECE
(cont.)
■ C ut the duct piece to size and
slip onto the bottom of the duct
connector.
■ U se duct tape to seal and secure
the duct piece to the connector.
■ P lace the assembly over the hood
outlet.
■ H old the assembly against
the ceiling. The penciled
centerline should show
through the slot in the
deflector. Mark the screw
holes on the sides of the
assembly.
■ R emove the assembly and
drill 1/8" pilot holes into the
wall studs.
■ E nlarge holes that did not
enter studs to 3/8" and tap
plastic or metal anchors into the holes, flush with
the wall.
■ M ount the assembly onto the hood outlet, push up
against the ceiling and install the screws provided.
CAUTION
Do not use sheet metal screws at
the hood flange connection. Doing so will prevent
proper damper operations. Seal connection with tape
only.
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières