Monogram ZV800 Instructions D'installation page 15

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WALL-MOUNTED INSTALLATION—RECIRCULATING
2
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
■ W ith the template taped in place, use a punch to
mark all mounting screw locations.
■ D rill 1/8" pilot holes at the 6 punched locations.
■ R emove the template.
■ T he 2 holes in the support bracket holes must enter
studs or the horizontal support.
■ U se wood screws to secure the mounting bracket to
the wall. The screws must engage wall studs or the
installed horizontal mounting support.
■ C heck to be sure that the bracket is level. There is
no way to level the hood after hanging it from this
bracket.
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4
Installation Instructions
3
PREPARE THE HOOD
■ R emove the hood from the box. Remove packaging
and tape.
Electrical
panel
■ R emove one screw on each side of the cover on
the electrical panel. Lift off the cover and set aside
with screws.
■ S tand the electrical panel upright.
■ A lign the screw holes in the
bottom of the panel with the
holes on the base of the
hood at the front side.
■ I nstall 3 screws provided.
Remove 2 side
cover screws
Junction box
Inside screw
Secure electrical
panel with 3
screws
15

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières