Monogram ZV800 Instructions D'installation page 20

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of supporting
100 lbs.
8" Min. Opening for Ductwork
Centerline of
Centerline of
installation
Installation
space
Space
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ C ut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ I nstall a horizontal support at least 1" x 6" between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room side
of the studs. Use cleats behind both sides of the
support to secure to wall studs.
■ R einstall drywall.
20
Installation Instructions
UNDER-CABINET INSTALLATION
View From Rear
View from rear
Cleats
cleats
1" x 6" Min.
1" x 6" min.
mounting
Mounting
support
Support
2
PREPARE THE HOOD
■ R emove the hood from the box. Remove packaging
and tape.
Electrical
panel
■ R emove one screw on each side of the cover on
the electrical panel. Lift off the cover and set aside
with screws.
■ S tand the electrical panel upright.
■ A lign the screw holes in the
bottom of the panel with the
holes on the base of the
hood at the front side.
■ I nstall 3 screws provided.
Remove 2 side
cover screws
Junction box
Inside screw
Secure electrical
panel with 3
screws
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières