Monogram ZV800 Instructions D'installation page 10

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE
2
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
■ W ith the template taped in place, use a punch to
mark all mounting screw locations.
■ D rill 1/8" pilot holes at the 6 punched locations.
■ R emove the template.
■ T he 2 holes in the support bracket holes must enter
studs or the horizontal support.
■ U se wood screws to secure the mounting bracket to
the wall. The screws must engage wall studs or the
installed horizontal mounting support.
■ C heck to be sure that the bracket is level. There is
no way to level the hood after hanging it from this
bracket.
10
Installation Instructions
3
INSTALL DUCT BRACKET
The duct bracket must be intalled against the ceiling.
This bracket will hold the duct cover in place at the
top.
Secure the bracket to the ceiling and wall:
■ A lign the marked centerline on the bracket with the
centerline on the wall.
■ M ark the 2 screw hole locations in the ceiling.
■ D rill 1/8" plot holes in the marked locations.
■ I f pilot holes do not enter studs, enlarge the holes to
3/8" and install wall fastener anchors.
■ D rive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
■ S ecure the bracket to the ceiling and wall with wood
screws and/or fasteners.
C L
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières