Check Installation Hardware; Ductwork, Wiring Locations; Ceiling Ducting - Monogram ZV950 Instructions D'installation

Hotte en acier inoxydable de 36 po
Masquer les pouces Voir aussi pour ZV950:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with the
hood and check contents.
10 Wood
Screws
2 Large
Flat Washers
3 Stainless Steel Grease Filters
16"
24"
23"
11"
2-piece
Decorative Duct Cover
(dimension shown
for reference only)
8
Installation Preparation
6 Wall
Fasteners
2 Mounting Brackets with 4
Hex Head Leveling Screws
2 Phillips Head
Decorative Screws
Duct Cover Bracket
• Drill 1/8" Pilot Holes For Mounting Brackets.
C L
5-7/8"
C L
C L
Align edge 25-1/2" above Cooking Surface.
Wall Mount Template

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.
■ Locate the template packed with the literature.
– M easure 36" from the floor to the top of
the cooking surface. Add 25-1/2" (or other
recommended space) from the cooking surface to
the bottom of the hood. Mark that location.
– Use a level to draw a straight pencil line on the wall.
6-1/4"
Centerline To Wall
8-1/2" Dia. Hole
FOR WALL VENT DUCT
• Drill 1/8" Pilot Holes For Mounting Brackets.
– Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:
■ U se a level to draw a line straight up, from the
centerline on the template to the ceiling.
■ M easure 6-1/4" from the back wall to the
centerline of a 8-1/2" hole on the ceiling.
NOTE: If drywall is not present, add drywall
thickness to the 6-1/4" dimension.
Wall Ducting:
If ductwork will vent to the rear:
■ U se the level to draw a line straight up from the
centerline on the template.
■ M easure at least 8" above the top mounting
bracket holes shown on the template to the
centerline of an 8-1/2" dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
■ T he junction box is located on the top of the hood,
at the back right side.
■ R oute house wiring as close to the ceiling location
as possible, through the ceiling, soffit or back wall.
Wiring should enter at least 4" above the bracket
on the right side (no less than 18" above the
planned lower edge of hood and ideally, 4" to the
right of planned ductwork.)
FOR CEILING
VENT DUCTING
Centerline
8" Min. Above
Top Mounting
Bracket Holes
5-7/8"
C L
Align edge 25-1/2" above Cooking Surface.
1" = 2.5 cm; 1' = 0.3 m
31-14900 Rev. 2

Publicité

Chapitres

Table des Matières
loading

Table des Matières