Monogram ZV800 Instructions D'installation page 17

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WALL-MOUNTED INSTALLATION—RECIRCULATING
6
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING
If house wiring is not 2-wire with
a ground wire, a ground must be provided by the
installer. When house wiring is aluminum, be sure
to use U.L. approved anti-oxidant compound and
aluminum-to-copper connectors.
■ R emove junction box cover and knockout.
■ U se a conduit connector to secure the conduit to
the junction box.
■ C onnect white leads to branch circuit white lead.
■ C onnect black leads to branch circuit black lead.
■ C onnect green/yellow leads to branch circuit green
lead or bare ground lead.
■ S ecure all connections with wire nuts on each
electrical connector.
■ P ush wires into junction box and replace cover. Be
sure wires are not pinched.
■ S ecure electrical panel cover with original screws.
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4
Installation Instructions
7
INSTALL DUCT COVERS
■ P lace the decorative duct
covers on top of the hood.
NOTE: The inside piece has vent
holes on one end intended for
use when the hood is installed for
recirculating purposes. Be sure
the vented end is at the top; the
vent holes will be visible in this
installation.
The inside duct piece must slip
into the folded ends on the outer
section.
Install
2 bottom
duct cover screws
■ E xtend the inner duct piece upwards to the ceiling
mounted air deflector.
■ S ecure the duct cover to the air deflector, driving
one screw on each side.
■ L ocate the screw holes on the bottom outside edge
of the hood.
■ S ecure the lower duct cover to the hood by
installing 2 screws from the bottom of the hood into
the duct cover.
Mounting
screws
Vent
holes
Install 2 screws,
duct cover and into
ceiling bracket
17

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières