Under-Cabinet Installation; Cabinet Requirements; Ductwork, Wiring - Monogram ZV800 Instructions D'installation

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CABINET REQUIREMENTS

This hood may be installed beneath a wall-mounted
cabinet.
■ L ocate the template packed with the literature.
■ I f the cabinet has been installed, it must be
removed so that wall framing supports can be
added.
24" Min.
The cabinet must be at least 20" high between the
bottom frame and the inside top. If the cabinet is not
20" from bottom to inside top, a custom cabinet or
modifications to a different size cabinet and/or soffit
may be required to accommodate the hood housing.
■ T he cabinet must be 36" wide and at least 12" deep.
■ T he cabinet must be firmly secured to wall studs
or the added framing support and capable of
supporting 100 pounds.
10-3/4"
11"
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4
Installation Instructions

UNDER-CABINET INSTALLATION

20" Min.
19-1/2"
19-1/2"
11-3/4"
11-3/4"
DUCTWORK, WIRING LOCATIONS
■ D etermine the exact location of the vent hood.
■ L ocate the Rear Wall Template packed with the
literature.
■ M easure 36" from the floor to the top of the cooking
surface. Add the pre-determined hood installation
height. Mark that location.
■ U se a level to draw a straight pencil line on the wall.
Top frame mounting
screw locations
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
13-3/4"
12-3/4"
REAR WALL TEMPLATE
Drill 1/8"
Pilot Holes
2-1/16"
49-80271
JR 07-04
■ T ape the template in position along the penciled line.
Check to be sure the template is level.
■ U se the level to draw a line straight up, from the
centerline on the template to the ceiling.
■ M easure 3-3/4" from the back wall to the centerline
of a 6-1/2" hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
to the 3-3/4" dimension.
HOUSE WIRING LOCATION:
■ T he junction box is located on the top left side of
the hood.
■ W iring should enter the back wall 20" to 26" above
the bottom of the hood, and within 4" of the right
side of the centerline. Wiring should enter at least 4"
above the bracket on the right side.
3-3/4" centerline
to wall
Ceiling
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
5-1/16"
9-5/8"
C L
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
8-1/8"
BOTTOM OF THE HOOD.
19

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières