Monogram ZV800 Instructions D'installation page 21

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
CUT THE OPENING
If the cabinet has been installed, remove it from the
wall.
■ U se the Top Cabinet Template to locate and cut a
hole in the bottom of the cabinet.
■ I f necessary, place the template on top of the
cabinet to accurately cut a matching hole.
■ I nstall the cabinet onto the wall.
The cabinet must be firmly secured to the wall
and be capable of supporting 100 lbs.
INSTALL WOOD BLOCKS IF NECESSARY
■ I nstall filler blocks whenever the cabinet frame
hangs below the cabinet bottom.
■ I nstall filler blocks whenever the cabinet bottom is
less than 3/4" thick.
■ I nstall the filler blocks on each side of the cutout.
The filler blocks will accept the hood mounting
screws.
NOTE: Additional filler blocks may be required along
the outside edges to accept the outside screws. See
Step 5.
Cabinet Frame.
Cabinet Bottom Shelf
Top of Vent
Hood
IMPORTANT: If filler blocks are not used, the hood
may not be secured to the cabinet.
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4
Installation Instructions
UNDER-CABINET INSTALLATION
Filler Block
Equivalent
to Depth of
Cabinet Recess
4
INSTALL SIDE "L" BRACKETS
Install 2 screws in each
bracket
■ I nstall the "L" brackets onto each side of the
cutout. The wide flat portion should be on top of
the opening. Install 2 screws into the top of each
bracket.
5
REMOVE SIDE SCREW
The top center screw on both sides of the hood
can be used to close up any noticeable gaps at the
outside edges. See illustration.
Remove screw
cover and screw
■ R emove the center screw cover and screw on each
side as shown.
21

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières