1 CDI unit
2 Hot starter cable
3 Throttle cable (return)
4 Throttle cable (pull)
5 Ignition coil
6 Radiator breather hose
7 Radiator hose 4
8 Cylinder head breather hose
9 CDI unit bracket
0 CDI unit band
8
A
CABLE ROUTING DIAGRAM
È Pass the hot starter cable and
throttle cables through the cable
guides.
É Pass the hot starter cable over
the top radiator mounting boss.
Ê Pass the hot starter cable and
throttle cables between the radi-
ator and frame, then over the
middle radiator mounting boss.
Ë Pass the throttle cables on the
outside of the ignition coil.
Ì Pass the carburetor breather
hose
(throttle
cable
through the hose holder.
Í Pass the radiator breather hose
at the rear of the radiator, on the
left of the chassis, and then
between the frame and radiator
hose 4.
6
Í
7
Ì
2 - 24
SPEC
Î Insert the CDI unit band over the
CDI unit bracket as far as possi-
ble.
Ï First install the CDI unit and CDI
unit band to the CDI unit
bracket,
then
bracket to the frame.
cover)
9
Î
1
Ï
0
B
1
A
Ë
the
CDI
unit
2 3
4
È
É
B
Ê
5