INSTALLATION PLANNING
Planning Considerations
1
Plan System Goals
Intended Function
Automation
•
Constant
•
Pressure
•
•
Pressure
•
Boosting
Protection
•
Irrigation
•
•
Dewatering
•
Hardware
•
Application
•
•
Centrifugal
Pump
Multi Pump
•
Submersible
•
Pump
•
Motor Type
•
FE MagForce
•
Induction
1. The planned usage of the overall system will determine which options and control methods are ap-
propriate, as well as how the VFD should be installed and programmed. Refer to the following pages
for examples of how the system might be used.
2. System options define and automate features that support the intended operation. These features
may require specialized control methods and programming. For more details, refer to
uration" on page 27
3. The SubDrive Connect Plus supports many different methods for automating motor speed control.
Refer to
"Drive Configuration" on page 27
4. The overall function of the system directly affects where and how the VFD should be mounted. Refer
to
"Physical Installation" on page 15
5. The selected motor application, along with the control method(s), determines how the VFD should
be connected. Refer to
6. The VFD can be quickly and easily programmed for most standard operations. Refer to
figuration" on page
to achieve the desired performance. Refer to
Connect Mobile Application" on page
2
Select Control
Identify Options
Methods
Run/Speed/Stop
Pipe FIll
•
Hand/Auto
Bump Mode
•
Transducer/
Drawdown
Sensor
•
Potentiometer
Broken Pipe
•
Switches/
Underload
Floats
Ground Fault
Communications
Moisture
•
Drive-to-drive
Sensor
•
Bluetooth
Multi Drive
Lead/Lag
and
"Advanced Application Options" on page
for possible control setups.
for guidelines.
"Electrical Installation" on page 19
27. Advanced features or options may require additional parameter adjustments
"Advanced Application Options" on page 35
39.
3
4
Install VFD
Hardware
Location
•
Inside
•
Outside
Climate control
•
Temperature
•
Moisture
Distance
•
Wire sizes
•
Filtering
requirements
Measurements
•
Clearance
•
Drilling
35.
for more information.
INSTALLATION PLANNING
Planning Considerations
5
Program
Install Wiring
Parameters
Conduit Rules
Basic
•
Routing
•
Application
•
Separation
•
Motor ratings
High Voltage
•
Setpoints
•
Grounding
I/O setup
•
Inputs
•
Input functions
•
Outputs
•
Output
Control circuits
functions
•
Feedback
•
Scaling
inputs
Option settings
•
Relay Outputs
•
Enable features
•
Communication
•
Set targets
"Drive Config-
"Drive Con-
and
"FE
6
11