The machine will recover the residual refrigerant into the service hoses, then the following
screen will be displayed:
Disconnect coupling from A/C system, press ESC to return to the MAINTENANCE MENU; A/C
PRESSURES CHECK is now successfully completed.
MAINTENANCE REPORT
The machine keeps track of the maintenance operations done.
From MAINTENANCE scroll to page 2 with the arrow
the following screen will be displayed:
SERVICES ARCHIVE
The machine keeps track of the operations done on refrigerant fluid: recovery, system refilling,
inner tank filling. For any operation, a record is made with date, time, type of operation,
quantities involved, operator nr., inner tank refrigerant fluid availability.
From MAINTENANCE scroll to page 2 with the arrow
the following screen will be displayed:
INSTRUCTIONS MANUAL
A/C PRESSURE CHECK
End of procedure
Press ESC to exit
- MAINTENANCE REPORT
FILTER CHANGE
DD/MM/YY
X.X Kg
DD/MM/YY
X.X Kg
VACUUM PUMP OIL CHANGE
DD/MM/YY
XX min.
DD/MM/YY
XX min.
- SERVICE ARCHIVE
2021
SEARCH BY PLATE
SEARCH BY DATE
-77-
DD/MM/YY XX:XX PM
ESC
and select MAINTENANCE REPORT
DD/MM/YY XX:XX PM
ESC
ESC
ESC
and select STATIC DIAGNOSIS
DD/MM/YY XX:XX PM
2020
ESC
EXTRACT ARCHIVE