Close and disconnect LP coupling from external tank and press ENTER.
Tank filling procedure successfully completed. Switch the machine off.
NOTE: if the external tank is not supplied with a liquid side coupling, upend it to recover liquid
refrigerant.
AIR PURGE MANUAL
Before each service check the presence of air in the cylinder, select the MAINTENANCE MENU
and press AIR PURGE MANUAL.
The following screen will be displayed:
INSTRUCTIONS MANUAL
TANK FILLING
Gas charged: 122 g
Pressure -0.1 bar
TANK FILLING
TANK FILLING – OPERATION COMPLETED
Gas charged: 138 g
Pressure -0.7 bar
MAINTENANCE
TANK FILLING
AIR PURGE MANUAL
GAS ANALYSIS
EMPTY HOSES
CHANGE DRYER FILTER
PRESS ENTER TO PURGE
Tank pressure
7.10 bar
Tank temperature
21.7°
Target pressure
5.20 bar
-60-
DD/MM/YY XX:XX PM
STOP
DD/MM/YY XX:XX PM
ESC
DD/MM/YY XX:XX PM
ESC
DD/MM/YY XX:XX PM
ESC
ENTER