Mopar ECO NEXT ONE Manuel D'instruction page 61

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

If "PRESS ENTER TO PURGE" is displayed, there is air in the tank. In this case, press ENTER:
the machine will begin discharging the air.
Press ESC to pause the Air Purging process.
NOTE: If there isn't air into the tank, the following message is displayed: AIR PURGE NOT
NECESSARY.
Press ESC to terminate the Air Purging process, and return to the MAINTENANCE menu.
GAS ANALYSIS
The machine will test the purity of the refrigerant gas in the A/C system before beginning
recovery. Contaminated refrigerant cannot be recovered, since it would contaminate all the
refrigerant contained in the storage bottle. Purity testing is conducted after a sample of the
refrigerant gas to be analyzed is taken.
From MAINTENANCE, select GAS ANALYSIS, the following screen will be displayed:
Open the LP valve
Connect and open the LP coupling connected to the A/C system, then press ENTER:
The analyzer will begin the calibration, then after few second will start gas analysis:
INSTRUCTIONS MANUAL
(ECO NEXT ONE HFO only)
GAS ANALYSIS
Open LP valve
CHARGEgg
Connect and open LP coupling
to A/C system and press ENTER
GAS ANALYSIS
CALIBRATION
20 %
-61-
DD/MM/YY XX:XX PM
ENTER
DD/MM/YY XX:XX PM
ESC
ENTER
DD/MM/YY XX:XX PM

Publicité

Table des Matières
loading

Produits Connexes pour Mopar ECO NEXT ONE

Ce manuel est également adapté pour:

Eco next one hybridEco next one hfo

Table des Matières