Quickstart; Installation - Burkert 8045 Mode D'emploi

Masquer les pouces Voir aussi pour 8045:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

This section provides a comprehensive installation and operation guide which will
assist with the commissioning of the 8045 Flow Transmitter.
2.1

INSTALLATION

See section 6.4
See section 3.1
See section 3.4
See
section 3.3.1
Fluid Control Systems

QUICKSTART

Unpacking
Verify
Ident. No.
O.K
Install the fitting
on the piping
Unscrew the 4
screws and open
Connect power
supply cable
Connect output
cable
Re-assemble the unit
and install onto the
fitting
Connect the earth to the
earthing screw
Turn on the
power
Check
display is 0
with no flow
Yes
Enter the
K-Factor
Program the Transmitter
Verification of items received
See section 6.5
Contact your local Bürkert
No
subsidiary
Ensure the power
supply is disconnected
before starting work.
Ensure that security
provisions are
considered with the
power cable and relay
circuit.
Pay attention to the
max. permitted load of
the output current
loop.
The sensor finger must
be immersed in fluid 24
hours before calibration
(section 4.5.3)
No
Immerse the transmitter
into the fluid and
perform a „flow zero"
point calibration
See section 4.4.3
See the next page .
4
8045

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

426532

Table des Matières