Télécharger Imprimer la page

Yamaha TT-R125Y 2009 Manuel D'atelier page 328

Masquer les pouces Voir aussi pour TT-R125Y 2009:

Publicité

CLUTCH AND PRIMARY DRIVEN GEAR
9. Adjust:
• Push lever position
Adjustment steps:
• Loosen the locknut 1.
• Turn the push rod 1 2 clockwise or
counterclockwise to match alignment
marks.
• Hold the push rod 1 to prevent it from moving
and tighten the locknut to specification.
• Tighten the locknut 1.
Locknut:
8 Nm (0.8 m • kg, 5.8 ft • lb)
10. Install:
• Dowel pins
• Gasket (right crankcase cover)
• Right crankcase cover
• Negative battery lead
(TT-R125E/TT-R125LWE) 1
• Lead holder
(TT-R125E/TT-R125LWE) 2
• Bolts (right crankcase cover)
TIP
• Apply Quick gasket® (YAMAHA Bond
No.1215) to end of the right crankcase cover
bolts, as shown.
• Tighten the bolts in stages, using a crisscross
pattern.
Quick gasket
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
11. Install:
• Kickstarter crank 1
• Nut (kickstarter crank) 2
TIP
Install the kickstarter crank so that there is 5 ~
10 mm (0.2 ~ 0.4 in) a between the kickstarter
crank and the right crankcase cover.
4-47
ENG
10 Nm (1.0 m • kg, 7.2 ft • lb)
®
:
50 Nm (5.0 m • kg, 36 ft • lb)
New

Publicité

loading

Ce manuel est également adapté pour:

Tt-r125ey 2009Tt-r125lwy 2009Tt-r125lwey 2009