Pfaff EGU PS 15 Traduction Du Manuel D'utilisation D'origine page 23

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Electric pallet truck EGU PS 15
English
4
Maintenance Instructions – View
Safety warning
Before inspection and maintenance work is carried out, appropriate measures should be taken to
remove all loads from the electric pallet truck.
Maintenance Intervals
daily or each time before use
every 50 operating hours or monthly
every 200 operating hours or quarterly
every 500 operating hours or every 6
months
every 1000 operating hours or annually
if required, but at least every 6 years
)
*
New units require the first oil change after max. 500 operating hours.
**)
e.g. by Pfaff-silberblau after-sales service
Die Lebensdauer des Flurfördergerätes ist begrenzt, verschlissene Teile müs-
sen rechtzeitig erneuert werden.
technische Änderungen vorbehalten
Maintenance Works
Check operating elements for faultless operation.
Check condition of the travelling rollers and roller axles
The guiding rollers are provided with long-term lubrication and are
thus virtually maintenance-free.
Grease running paths and lateral faces of guide rollers in the lift-
ing carriage.
Check the level of the hydraulic oil with forks completely lowered
and the pallet truck in horizontal position.
Check the hydraulic system for leakage, seating of unions and
chafe marks (hoses).
Check adjustment of the lifting chain, if necessary adjust, clean
and grease
Check seating of all screw connections.
Lubricate conical lubrication nipple and turntable bearing.
Re-adjust battery pole screws, tightening torque approx. 2-3 Nm.
Check proper state and tight seat of all electric wires for control
current and main current
Check the carbon brushes of the electric motor for smooth run-
ning and wear.
Check the finger lever for spring pressure and perfect return
movement.
Check seating and smooth running of the control handle.
Check all parts of the pallet truck for wear and replace defective
parts where necessary
Replace hydraulic oil and filter
Change gear oil. *
Check readability of type plate.
Check electric installation acc. to directive BGV A3
Authorise inspection by competent technical expert **
Replace hydraulic pressure hoses.
design changes under reserve
F 08.01.161
)
changements techniques sous réserve
)
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Egu ps 14 plusEgu ps 14 basicEgu ps 14 li-ion

Table des Matières