Commissioning And Standard Use 2; Switching The Installation On; Gate Travel Self-Learning - SOMFY FREEVIA LINE Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2.1 Switching the installation on

1.
The
indicator flashes (twice).
The motor is switched on and awaiting
self-learning.

2.2 Gate travel self-learning

Prerequisite - before starting self-learning, check that:
• The installation is switched on:
the indicator light
flashes (twice).
IMPORTANT
If the gate is open once self-learning is complete:
1.
Clear the settings (see page 31).
2.
Switch the motor off.
3.
switch the wires connected to terminals 10 and 11 (green M1 label) of the control electronics (see
"Motor wiring", page 12).
4.
Unlock the motor.
5.
Position the gate at its mid-point.
6.
Lock the motor.
7.
Switch the motor on.
8.
Starting the self-learning process again.
During the self-learning process, pressing button 1 on the remote control or the
control electronics causes the gate and the self-learning process to stop.

COMMISSIONING AND STANDARD USE 2

Commissioning and standard use
EN - FREEVIA LINE installation and operating guide - SOMFY
2. If the indicator light
the number of flashes is not as expected: see
diagnostic page 32.
• The gate is at its mid-point.
• The motor is locked.
Press the
button on the control electronics.
• The gate opens, closes, opens partially and
closes again.
• The indicator light
is lit constantly.
Self-learning has been successfully
completed and the motor is operational.
If the indicator light
flashes (twice), begin
the self-learning process again.
The gate must be closed once self-learning
is complete.
If the gate is open, see the IMPORTANT box
below.
does not come on or
button on the
2
15

Publicité

Table des Matières
loading

Table des Matières