Prerequisites For Installation; Stop Blocks On The Ground; Positioning The Motor; Electrical Preequipment - SOMFY FREEVIA LINE Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Prerequisites for installation

Stop blocks on the ground

The gate travel must be defined by end stops firmly fixed in the ground.
Opening end stop

Positioning the motor

Electrical pre-equipment

Cables required

• Power supply: 3 x 1.5 mm² cable or
3 x 2.5 mm² for outdoor use
(type H07RN-F minimum)
• Linking of cells: 2 x 0.75 mm² cable
• Other accessories: see page 6
Cable feed
• Underground cables must be equipped with a
protective sheath with a sufficient diameter to
contain all the cables.
• Fit a 230 V electrical input as close as possible
to the motor.
Closing end stop
Provision must be made for the supply cable
to be fed through according to the electrical
standards in force in the country of use.
If
a
cable
conduit
use
a
cable
withstand
the
(ref. 2400484).
Gate
Cable feed
EN - FREEVIA LINE installation and operating guide - SOMFY
cannot
be
made,
grommet
which
will
passage
of
vehicles
Concrete base
5

Publicité

Table des Matières
loading

Table des Matières