Final Preparation - Erreka VULCAN D Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4

FINAL PREPARATION

Connections and checks
F
< 400N in spaces between 50 mm and 500 mm
d
F
< 1400N in > 500 mm spaces
d
User instructions
1 Instruct the user on the use and maintenance of the
installation.
2 Signpost the gate, showing that it opens
automatically and indicating how to operate it
manually. Where appropriate, indicate that
operation is using the remote control.
1 Carry out the installation and the connections for all
the elements of the facility in line with the control
board instructions.
Additional protection devices must be installed
in order to comply with the requirements of
Standard EN 12453:2017.
2 Check that the mechanism is correctly regulated.
The opening and closing pressures must be
adjusted to respect the values indicated in
standard EN 12453:2017, as shown in the
attached chart. The measurements must be
made in line with the method described in
standard EN 12453:2017.
The gate must not exercise force greater than
150N (15 kg).
3 Check the operation of all the installation elements,
P240N
especially the protection systems and the manual
operation unlocking system.
SAFETY WARNINGS TO USERS:
• This device can be used by children aged 8 and over
and by persons with impaired physical, sensorial or
mental capacities, or people who have insufficient
experience or knowledge, provided they have been
suitably supervised and trained with regards to the
safe use of the device and they fully understand the
risks involved.
• Children must not be allowed to play with the
device.
• Cleaning and maintenance must not be carried out
by children unless supervised.
INSTALLATION
VULCAN D Hydraulic operator
45

Publicité

Table des Matières
loading

Table des Matières