INSTALLATION
ENCODER1
P13 P14 P15 P16 P17 P18 P19 P20 P21 P22 P23
A1
Operator 1
A2
Operator 2
G1/G4 Red cable (motor)
G2/G5 Blue cable (motor)
SW1
Main switch
Carry out the following in the VIVO-D201(M) switchboard:
• Select the number of operators using C0 (C001: one operator, C002: two operators).
• Select the directions using C1 (A1) and C2 (A2).
• Programme C7 for operation without encoder or limit switches (C700).
• For the ARES 24V operator, programme C304.
• Adjust the thrust in accordance with the weight of the gate (parameter A6).
Turning direction check: after connecting the power and activating any of the key devices, the
gate makes a reset (the display showsrS): the gate closes until it reaches the stopper, assigning this
stopper with the position "gate closed" If it opens instead of closes during the reset, change turning
direction using C1 (A1) or C2 (A2).
7
FINAL CHECKS
Checking the closing power
The installation must respect the values
indicated in Standard EN 12453:2000. All
measurements must be made in line with the
method described in Standard EN 12445:2000.
• F
< 400N in spaces between 50mm and
d
500mm
• F
< 1400N in spaces> 500mm
d
34
Installation Manual
We recommend switchboard VIVO-D201(M).
ENCODER2
-FT
AUX
(Test)
24 Vdc
P1 P2 P3
P4 P5 P6
P7 P8
P9 P10
24VDC operators
P24 P25
MOTOR2
G4 G5
G6
MOTOR1
P11 P12
G3
G1 G2
User instruction
1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the use manual.
2 Signal the gate, showing that it opens automatically
and indicating how to operate it manually. Where
appropriate, indicate that operation is using the
remote control.
SW1
G7 G8
G9 G10
N
L
POWER - 230V
VIVO-D201:
VIVO-D201M:
P144Y2