Erreka VULCAN D Manuel De L'installateur page 38

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
Inward opening
The installation levels must be respected in order for the operator
to work correctly.
i
Use of the chart:
Multiple A-B pairs can be chosen for a specific
opening angle. Generally, one of them will be
determined by the features of the installation (size
of the pillar, presence of walls, etc).
38
Installation Manual
960mm
1 Use the chart to select the specific level for the
installation.
2 Following the grid, move from the level to the
line corresponding to the required opening
angle.
3 Following the grid, move to the other level.
80mm
Opening
Level A Level B
angle
80º
155
130
85º
140
130
90º
140
120
90º
115
145
95º
125
125
100º
120
120
110º
105
120
M240C

Publicité

Table des Matières
loading

Table des Matières