Erreka VULCAN D Manuel De L'installateur page 40

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
Procedure
Position the front and rear supports
Mount the fork
40
Installation Manual
1 Attach the front (1) and rear (2) supports, keeping
strictly to the levels shown in the previous section.
The installer should
attachment system (welding, screwing, molding,
etc) in accordance with the composition of the
material to which the supports are attached (metal,
concrete, etc).
Attach the supports on sufficiently robust
structural elements.
O
IT IS VERY IMPORTANT TO RESPECT THE LEVELS:
If the levels are not respected, the spindle will
not make the whole open/close, meaning the
slow down system will not work.
O
Carry out the welding with the operator
withdrawn and at a distance. If not, the spindle
may become damaged from welding splatter,
which could lead to failures and oil leaks.
P240A
1 Position the fork (4) in its housing in the rear cover
(5).
2 Introduce the horizontal pin (6), crossing the fork
and the cover.
3 Secure the pin using the safety washer (7).
4 Position the caps (8) to close the housing.
P240K
choose
the support

Publicité

Table des Matières
loading

Table des Matières