Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
THREE PHASE OPERATORS (SK130E, SK135E, SK130C and SK135C)
SK130-SK135
7
6
3
Operator parts (SK130, SK135):
D:
Unlock switch
K:
Thermal protector
FCA:
Opening limit switch
FCC:
Closing limit switch
FCS:
Additional limit switch (to be used in
accordance with the requirements of the
customer or installation)
Control board parts (VIVO-T101):
PUL1: Open mini-pushbutton
PUL2: Close mini-pushbutton
SW1:
Main switch
SW2:
DIP switch programming
7

FINAL CHECKS

Closing thrust check
Installation must respect the values indicated
in Standard EN 12453:2000. All measurements
must be made in line with the method
described in Standard EN 12445:2000.
• F
< 400N in spaces between 50mm and 500mm
d
• F
< 1400N in spaces > 500mm
d
with VIVO-T101 board
P7 P8
P1 P2 P3
P4 P5 P6
P15 P14 P16
P11 P12
P22 P23
STOP
LOCK
ST1
FT1
ST2
FT2
FCA1
FCC1
Operator connections SK130, SK135:
1
Opening limit switch (FCA)
2
Limit switches common
3
Closing limit switch (FCC)
4-5 Additional limit switch (FCS)
6-7 Thermal protector / unlock switch
U, V, W: Motor connections
PE: Earth connection
Press PUL1 (open) and PUL2 (close) to check that
the turning direction of the operator is correct. If
it is not, interchange connections V and W.
User instruction
1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the user manual.
2 Signpost the door, showing that it opens
automatically and indicating how to operate it
manually.
operation is using the remote control.
VIVO-T101
G1
G2
G7 G8
G9 G10
Courtesy
24Vac
Lamp.
MOTOR1 (G2-G1-COM)
Light
Where
appropriate,
SKY electromechanical operator
INSTALLATION
G3
N
L
POWER
P93W
indicate
that
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sky sk110cSky sk130eSky sk130cSky sk135eSky sk135cSky

Table des Matières