Connector Assignment Of Slot Ii (5-Terminal) Input For Pulse Signal, Standard Signal, Metering Lock, Batch And Metering Monitoring - Ecolab EMP KKS E60 Manuel D'utilisation

Pompe deseuse à membrane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.3
Connector assignment of slot II (5-terminal) Input for pulse signal, standard signal,
metering lock, batch and metering monitoring
Fig. 12: Slot II (5-terminal)
Conductor
PIN
color
1
brown
2
white
3
blue
4
black
5
grey
(plug assignments
1.
Remove the protective cap.
2.
Mount the connector plug according to the connector assignment.
CAUTION!
Only use a connector plug from our product range! (included in the delivery
scope).
Assignment
output 5 V, DC (loadable with max. 50 mA)
pulse input
metering lock
GND (┴)
Input standard signal 0/4...20 mA
Ä Chapter 14.5.2 'Connector II ' on page 125).
39
also as configurable batch / metering monitoring,
Ä Chapter 10.3.13 'Configuration / Metering monitoring'
Ä Chapter 10.3.15 'Configuration / Batch'
on page 82 &
on page 93
Device installation
417101442 Rev. 12-02.2019

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emp kks e60+

Table des Matières