3 INSTALLATION REED
3.4.5 Electrical connection electronic module SE35
with pulse output on relay REED
Connection to PG 13.5 cable gland
Ensure the electrical wiring via 2 cable
glands. Remove cover, pull cable through
PG 13.5 and wire according to following pin
assignment (fig. 3.9):
1: Current output 4...20 mA
2: L+ (12...30 VDC)
3: L-
4: Earth (earth lug)
5: Pulse (relay REED)
6: Pulse (relay REED)
PLC-connection: Depending on the PLC-version,set the switch 1 on the circuit board
to position A or B (fig. 3.9 and fig. 3.10).
4-20 mA Output: If the 4-20 mA current output is used, remove the strap (1-3) (fig. 3.9).
8035
8035
2
Position A
SWITCH
1
3
Fig. 3.10 SE35 with relay REED, 4-20 mA output connection to a PLC
W
arning: If the current output 4...20 mA is not used: set the switch 1 in position
!
A (fig. 3.10) and the strap between 1-3 (fig. 3.9).
8035
V+
L+
PLC
4...20 mA
L-
0V
FLOW TRANSMITTER 8035
Coil
Hall sensor
Sensor connection
SE35 REED
Fig. 3.9 Wiring SE35 with relay REED
8035
8035
Position B
SWITCH
E-13-
Strap (4-20 mA Output)
1 2 3 4
Switch 1
5 6
L+
2
4...20 mA
1
L-
3
0V
V+