Maintenance - John Bean QUADRIGA 1000 Manuel D'utilisation

Masquer les pouces Voir aussi pour QUADRIGA 1000:
Table des Matières

Publicité

6
2
3
max
min
96
7
4
1
6.0-1
6.0-2

Maintenance

6.0 Maintenance
This
tire demount unit will continue to provide maximum
working effi ciency even after a long period of intensive
use as long as the operator carries out scheduled
maintenance as indicated below.
W A R N I N G : B E F O R E AT T E M P I N G A N Y
MAINTENANCE OR REPAIRS THE MACHINE MUST
BE DISCONNECTED FROM THE ELECTRICAL
POWER SUPPLY AND THE COMPRESSED AIR
FEED LINE.
Arrange for the following to be carried out
5
Check the various parts listed below for
excessive play and adjust if necessary (Call the
technical service center):
Figure 6.0-1
1) Wheel support.
2) Vertical activation bar on tools
3) Tool unit slide guides
4) Bead-breaker vertical slide guide
5) Lifter unit slide guides.
carry out:
Removal of accumulated dirt with non-fl ammable
liquid detergent.
Restoration, using a brush, of a suitable quantity of
oil for mechanical lubrication.
on the parts:
Figure 6.0-1
3) Tool unit slide guides
4) Bead-breaker vertical slide guide
5) Lifter unit slide guides
6) Automatic tool mobile parts and arms.
7) Bead pusher tool extraction rod.
• Check hydraulic oil level (Fig.6.0-2).
Note: Perform the check with all hydraulic cylinders
closed.
To achieve this condition, position the parts as
indicated below:
- Bead breaking arms; touching in the central position
- Wheel clamping bar; right down.
If necessary add:
ESSO
:
SHELL
:
TOTAL
:
or equivalents.
Maintain a level close to "max".
Oil change is not required.
Operator's Manual
Every 6 months
Every 4 months
Nuto H 46
Tellus oil 46
Azolla 46
Every 2 months
QUADRIGA 1000/BB

Publicité

Table des Matières
loading

Table des Matières