Test & Inspection Methods - Stannah 600 Manuel D'installation

Masquer les pouces Voir aussi pour 600:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
Test & Inspection Methods
GB
Introduction
This work method is used for guidance
when
commissioning
completing the Certificate of Test and
Examination after the stairlift is installed.
Section 1— Description
b) Enter details:

Contract or order reference number
e.g. 99390

The chair serial number

The carriage serial number
Fit correct weight sticker to carriage
C)
label from label pack.
e) Check that the motor tested label is
present on the motor.
Section 2— Electrical Tests
a) Measure AC supply across the live and
neutral terminals at the charger supply
input.
b) Measure battery voltage.
c) Carry out functional test to confirm
current overload device trips effectively.
d) Electronic
trip
seconds).
f) Fuse rating (max 2 Amps).
g) Check polarity at spur or the incoming
mains supply.
h) Carry out a continuity test to ensure the
0
volt
wire
electrically connected to the rail.
i)
Check polarity of battery connections.
j)
Enter mains AC supply frequency (Hz)
for the appropriate country.
l)
Motor reversal delay (min 3 seconds).
Section 3—Battery Tests
a) Measure battery charge voltage.
b) Delete as necessary.
c) Delete as necessary.
d) Test battery charge condition using the
four volt drop principle.
e) Visually
check
corrosion.
f) Check off charge indicator operates.
28
a
stairlift
and
time
(maximum
is
mechanically
for
any
leaks
Section 4 — Mechanical/Operation Test
Switch Operation
a) Delete as necessary.
b) Delete as necessary.
c) Delete as necessary.
d) Delete as necessary.
e) Delete as necessary.
f) Test and verify the function of the
overspeed governor and safety gear. Refer
to page 27 for work method.
g) All electrical safety devices function
correctly.
h) Confirm that hinge safety interlock
switches operate correctly (stairlift
inoperative unless hinge fully closed).
i) Confirm that hinge position switch
operates correctly (alarm active unless
hinge fully raised).
Component Functioning
j) Record the stopping distance (must not
exceed 20mm).
k) Check operation of carriage control
buttons.
l) Confirm the tested mark is present on
the overspeed governor assembly.
3
m) Carry out Installation overload testing.
Refer to page 19 for work method.
n) Confirm alarm operates.
o) Delete as necessary.
P) Record footrest heights.
and
Section 5—Confirmation
The stairlift user must be fully instructed on
the use of the stairlift, including the
emergency handwinding procedures. All
operating instructions should be handed
over to the user on completion.
Section 6—Declaration
This section must be completed in fully
using the distributor's address and signed.
On completion of the final test and
examination and completion of the test
certificate, affix the warning labels to
or
the
carriage
important to ensure compliance with
CE directives.
assembly.
This
is

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières