Before Switching On - Lenze 8200 motec Instructions De Montage

Masquer les pouces Voir aussi pour 8200 motec:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7
Commissioning

Before switching on

)
Note!
Do not change the switch−on sequence.
ƒ
In the event of a fault during commissioning please see the chapter
ƒ
"Troubleshooting and fault elimination".
In order to avoid personal injuries or material damage, check the following before
connecting the mains voltage:
ƒ The wiring for completeness, short circuit, and earth fault
ƒ The "emergency stop" function of the system
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage
of the controller.
ƒ If no function module is used, the FIF cover has to be fitted (delivery status).
ƒ If the internal voltage source X3/20, e.g. of the standard I/O is used, terminals X3/7
and X3/39 have to be bridged.
EDK82MV371 DE/EN/FR 7.0
Commissioning
l
Before switching on
7
107

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E82mv 2b sérieE82ev251E82ev371E82mv251_2bE82mv371_2b

Table des Matières