Commissioning

8.1

Before you start

Tip!
Keep to the switch-on sequence.
In the event of faults or errors during commissiong, see chapter "Troubleshooting and fault
elimination".
Check ...
... before connecting the controller to the voltage supply
Check the wiring for completeness, short circuit and earth fault
If you do not use a function module (as delivered):
– Is the FIF cover mounted?
If you use the internal voltage source X3/20 of the standard I/O:
– Are the terminals X3/7 and X3/39 bridged?
... the setting of the main drive parameters before enabling the controller
Is the V/f rated frequency adapted to the motor connection?
Is the configuration of the analog inputs and outputs adapted to the wiring?
Is the configuration of the digital inputs and outputs adapted to the wiring?
Are the drive parameters relevant for your application set correctly?
If necessary, use the keypad or PC to adapt them.
L
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Commissioning
EDK82EV903 DE/EN/FR 2.2
Before you start
91

Publicité

Table des Matières
loading

Table des Matières