Before Switching On - Lenze 8200 vector Instructions De Montage

Masquer les pouces Voir aussi pour 8200 vector:
Table des Matières

Publicité

Show/Hide Bookmarks
Show/Hide Bookmarks
Tip!
l
l
Damage to persons or material can be avoided by checking the following...
... before connecting the controller to the voltage supply:
The wiring for completeness, short circuit and earth fault
l
The function "Emergency off" for the system
l
The motor connection type (star/delta) must be adapted to the output voltage of the 8200
l
vector.
If you do not use a function module, the FIF cover must be attached (as delivered).
l
With the internal voltage source X3/20, for instance, of the standard-I/O, terminals X3/7 and
l
X3/39 must be bridged.
... and the setting of the main drive parameters before enabling the controller
Are the drive parameters relevant for your application set correctly?
l
– e.g. the configuration of the analog and digital inputs and outputs
L
Keep to the switch-on sequence.
In the event of faults or errors during commissioning, see chapter "Troubleshooting
and fault elimination".
EDK82EV3 DE/EN/FR 2.0
Commissioning

Before switching on

7
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Edk82ev3

Table des Matières