Putting The Load Down - Releasing - probst STONEMAGNET SM-600-GREENLINE Instructions D'emploi

Masquer les pouces Voir aussi pour STONEMAGNET SM-600-GREENLINE:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WARNING
Putting the load down – releasing
WARNING
Standard Stone Magnet
SM-600
Locking button
Press the locking button at the same time to slide the
manual slide valve.
34/43
Risk of injury from falling objects
Never quickly move the lifting device with lifted load over uneven surfaces.
Danger due to tilting parts
Lower the load carefully (distance to the ground approx. 20-30 cm), then
remove Load-securing chains and throw it under the load.
Never grip with the hands under load (stone slab)! Danger of squeezing!!!
Safety chain should be returned to chain case.
The load must be securely on the floor or in a suitable storage device
before releasing the load from the lifting device.
Before releasing the load from the lifting device, it must be secured from
sliding or tilting as necessary.
Once the load has been held by the load securing chain, the load securing
chain must be properly tested and replaced if necessary.
Damaged load-securing chains must not be used any further!!
Releasing the Load
Power Stone Magnet
SM-600-POWER
|
SM-600-POWER-FFS
Remote control option
Press both buttons at the same time to release.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sm-600 greenline

Table des Matières