Télécharger Imprimer la page

Seltron SGC16H Mode D'emploi page 43

Régulation différentielle

Publicité

EN
CONTROLLER INSTALLATION
The SGC controllers are installed directly on the wall or on DIN rail or in the opening of the solar
group system.
WALL INSTALLATION
Install the regulator inside in a dry place, where it is not exposed to any strong electromagnetic
fields. The controller is most common installed on the wall in the boiler room. Installation on the
wall is carried out according to the following procedure:
1. In the area of installation drill 2 holes with 6 mm in diameter, app. 40 mm deep.
Centres of holes must be 120 mm apart vertically.
Insert screws anchors. Screw the screw in the upper anchor in a way that approximately 4 mm
of gap remains between the screw head and wall.
2. Hang the controller on the upper screw.
3. Insert the lower screw and screw it in.
|
Installation manual
43

Publicité

loading

Ce manuel est également adapté pour:

Sgc26h