Installation and Operation Manual
X-VAP-VDM300-eng
Part Number: 541B210AAG
October, 2018
4-6 VDM300 Removal
4-7 VDM300 Packaging
4-8 VDM300 Shipping
4-9
Brooks
• Drain system according to section 3-3
• Turn off tank heater
• Remove electrical connections
• Let cool for 1 hour.
• Remove process connections and tank drain
• Unbolt and remove from system
• Use double-walled boxes for heavier items.
• If reusing a box, remove all old labels, and make sure it's high-quality, with
no holes, tears, or dents.
• Choose cushioning with enough density to keep items from shifting.
• All units are to be packaged separately
• Both the SDS and the Decontamination Statement are to be attached to the
OUTSIDE of the shipping container.
Prior to returning any device to the factory, visit the Brooks web site (www.
BrooksInstrument.com) for a Return Materials Authorization Number (RMA#),
or contact one of the locations provided on www.brooksinstrument.com/
globalsupportcenters prior to returning the device, it must be drained and
purged in accordance with Section 4-6.
All flow devices returned to Brooks require completion of the Brooks Instru-
ment Decontamination Statement, along with a Safety Data Sheet (SDS)
for the fluid(s) used in the instrument. Failure to provide this information will
delay processing by Brooks personnel. Copies of these forms can be down-
loaded from the Brooks website (www.BrooksInstrument.com) or are avail-
able from any of the Brooks Instrument locations provided on p. 2-1, www.
brooksinstrument.com/globalsupportcenters
VDM300 Vapor Delivery Module
®