Delay
Delay
Charge start delay
-
Charge end delay
-
at mains failure restart charging
-
at mains failure
-
-
If the "Restart charging" option is activated, the charging process is automatic-
ally restarted after a fault in the electrical grid as soon as the electrical grid is
available again.
If the "Automatic/continue charging" option is activated, the charging process is
automatically continued after a fault in the electrical grid as soon as the electric-
al grid is available again.
Calendar
calendar
The calendar function enables charging to be started automatically according to
the following criteria:
-
-
-
Further settings are possible within the calendar function:
Delay time (minutes) between the activation time of the charge start and the
actual charge start.
Delay time (minutes) between the signaled charge end (e.g., green indicator)
and the actual charge end.
If this option is activated, the charging process is automatically restarted
after a fault in the electrical grid as soon as the electrical grid is available
again.
Restart charging
Automatic/continue charging
Time window within which charging should not be started when a battery is
connected.
Time window within which a defined curve 1 should be started when a bat-
tery is connected.
Time window within which a defined curve 2 should be started when a battery
is connected.
To activate the calendar function,
1
select and confirm the "ON" set-
ting.
"Charging settings" menu item:
-
Type of battery for all curves:
e.g. Pb-WET.
-
Curve settings when the corres-
ponding curve is selected.
51