5.1 Getting the system ready for operation
Plug the mains plug of the control unit into the socket. The system will
initialise automatically. During initial initialisation of the system, the
control unit requests four basic settings.
1. Language
}
2. Date/time
Correct enter
3. Standard
necessary for
4. Nominal size
measuring
5. Calibration
▲
➤ Selection using
▼
➤ Stored in system memory by pressing "OK"
➤ After setting 1 to 5.
➤ Switch unit loads program memory
➤ Start operating mode
➤ System is ready for operation
5.2 Duties of the user
Check
- for transport or installation damage
- for structural defects of all electrical and mechanical components for
seat and function
- the cable connections
395-016
Operation
Customer instruction based on the installation and operating
instructions
- Go through installation and operating instructions with the customer
- System operation (explaining and describing)
- Explanation to the customer about the operator's duties
- Remind about regular servicing (see chapter 6)
5.3 Instruction / handover
The chapter "Safety instructions" must be heeded (page 4)!
Commissioning is carried out by a specialised firm or by an authorised
KESSEL agent (at an additional charge). The following persons should
be present for the handover:
- Person authorised to perform the acceptance on behalf of the buil-
ding owner
- Specialised firm
In addition, we recommend the participation of operating personnel/
operator and the waste disposal contractor.
Summary of instruction:
- Get the system ready for operation
- Check the system
- Instruction based on the installation and operating instructions
- Preparation of the handover certificate
Once instruction is completed, the system must be made ready for
operation.