Télécharger Imprimer la page

Roger Technology CTRL Instructions Et Consignes Pour L'installateur page 76

Masquer les pouces Voir aussi pour CTRL:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 133
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
2. Check that the "operator present" function is not enabled (
3. Check the spring balance setting and the mechanical stop settings.
For further information, refer to the installation manual of the barrier.
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
4. For installations with opposed barriers, connect the command signals and safety devices to the MASTER controller.
5. If the ACS/BA/60 detachable boom coupling system is not installed, the parameter
6. Move the barrier boom into the completely CLOSED position.
7. Press TEST (see TEST mode in paragraph 10.3) and check the command signal and safety device states. If the
safety devices are not installed, jumper the contact or disable safety device function from the relative parameter
(
,
and
).
45°
TEST
1 click
11.2
STANDARD (STAND ALONE) acquisition procedure:
45°
PROG
AP P-
x4 s
AU to
OPENING
• Press and hold PROG for 4 seconds.
76
45°
UNLOCK
2x360°
BIONIK 4HP, 6,
8, PC, PE
ONLY FOR BI/004
AU to
AU
to
OPEN
wait...
is shown on the display.
OPEN
STOP
CLOSE
).
>45°
<45°
TEST
See chapters 15 and 16
No
1 click
PROG
TEST
No
1 click
Press and hold...
Yes
TEST
ACQUISITION
PROCEDURE
Ch. 11.2
1 click
PH A5
PH A5
PH
wait...
CLOSING
must be set to
Until ...
ACQUISITION
PROCEDURE
Ch. 11.2
LOCK
2x360°
A5
BIONIK 4HP, 6,
ONLY FOR BI/004
8, PC, PE
CLOSED
.
Yes

Publicité

loading