Oil Change Intervals; Grease Change Intervals; Dismantling And Re-Assembly; Dismantling - salmson NOLH Installation Et Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

  ENGLISH  
 
 
 
Greasing nipples : 
 
Grease 
NLGI2* 
Temperature range 
‐20 to +100°C 
(‐4 to 212°F) 
Description acc. To DIN 
KP2K‐25 
BP 
Energrease LS‐EP2 
Elf 
Multis EP2 
Fuchs 
RENOLIT EP2 
ESSO 
Beacon EP2 
Mobil 
Mobilux EP2 
Q8 
Rembrandt EP2 
Shell 
Alvania EP2 
Texaco 
Multifak EP2 
SKF 
LGEP 2 
(*) NLGI 2 is a replacement grease and should not be mixed with other 
quality of grease. 
 
Bearing bracket size and grease/oil quantity : 
Bearing bracket size 
25 
35 
45 
55 
65 
Bearing bracket size 
55 
65 
 
9.2.1.1  Oil change intervals 
The bearing bracket is delivered  without the first oil load. Before 
start up proceed with oil filling through the filling port "A" (fitted 
 
with a plug/level gauge) up to the indicated oil level. 
A = Filling plug 
B = Drain plug 
C = Constant level oiler 
 
 
A  constant  level  oiler  is  available  as  an  option.  When  oil  level 
 
decreases in the bearing housing, air comes in the auxiliary oil tank 
and allows oil to go inside the bearing housing. Oil will run in the bearing 
housing until optimum level "N" is reached inside.  
In  this  case,  first  filling  of  bearing  housing  is  done  through  the  upper 
port fitted with a plug. 
All manuals and user guides at all-guides.com
 
NLGI3 
‐20 to +100°C 
(‐4 to 212°F) 
KP3K‐20 
Energrease LS‐EP3 
Multis EP3 
RENOLIT EP3 
Beacon EP3 
Mobilux EP3 
Rembrandt EP3 
Alvania EP3 
Multifak EP3 
‐ 
Oil ( liter ) 
0.22 
0.38 
0.57 
1.50 
2.00 
 
Grease ( g ) 
30 
40 
 
 
Level  is  reached  when  oil  appears  in  the  elbow  of  the  fitting  (G).  (to 
check, rotate tank). Then fill in the auxiliary oil tank and put back in its 
vertical  position.  Always  check  that  oil  tank  is  filled  with  oil  while  the 
pump is running. 
 
D = Oil tank 
E = Fitting 
F = Oil tank filling port 
G = Elbow of tank fitting. 
 
When  assembling  the  oil  tank  on  the  pump,  make  sure  it  is 
perfectly vertical (pump is horizontal). 
 
Oil change intervals : 
If  ball  bearings  are  new,  oil  load  should  be  replaced  after  200  hour  of 
running time, the renewal is as indicated below. 
Light duty, bearing temperature below 5°C, no risk of pollution : once a 
year. 
Standard  duty  or  heavy  duty,  bearing  temperature  above  50°C,  or 
pollution risk : every 6 months. 
 
9.2.1.2  Grease change intervals 
Ball bearings are greased before delivery. 
 
Light duty conditions 
Grease change intervals 
 
After  10000  operating  hours  or  after  2  years,  bearings  should  be 
dismantled, cleaned and filled again with grease. For unfavorable 
operating  conditions  (severely  damp,  dusty  atmosphere  or  hot  service) 
greasing intervals may be shortened. 
For grease replacement or re‐lubrication, high quality lithium soap 
grease should be used (eg. Mobilux 2, Esso Unirex N3, ...). 
 
9.3 DISMANTLING AND RE‐ASSEMBLY 
9.3.1
DISMANTLING 
Make  sure  that  electric  power  is  disconnected  and  could 
not  be  switched  on  again  by  fault  during  maintenance 
operations. 
•  Drain  the  piping  at  least  between  the  isolating  valve  on  suction 
and discharge sides. 
• If necessary disconnect any measuring sensors and gauges. 
• Remove drain plug and drain the pump casing. 
•  If  necessary,  remove  connections  to  mechanical  seal  auxiliary 
piping. 
•  If  necessary  drain  oil  from  bearing  bracket  and  remove  constant 
level oiler to avoid damages during following operations. 
• Pump casing can be kept fastened to pipe work. 
• Remove motor fastening screws and move the motor rearward so 
that there is enough space to remove the back pull‐out assembly. 
When using a coupling with spacer part, it is not necessary 
to move the motor rearward. 
• Dismantle coupling guard, half coupling on pump side. 
 
16 
 
Standard or heavy duty 
conditions 
n<1500 RPM 
1500<n<3000 RPM 
Every 
Every  
5000 hours 
2500 hours 
Or each 12 months 

Publicité

Chapitres

Table des Matières
loading

Table des Matières