Installation; Installation Of The 8202 Onto The Pipe - Burkert ELEMENT 8202 Mode D'emploi

Ph/redox-mètre ou conductivimètre
Masquer les pouces Voir aussi pour ELEMENT 8202:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.2.
installation of the 8202 onto the
pipe
danger
risk of injury due to high pressure in the installation.
• Stop the circulation of fluid, cut-off the pressure and drain the
pipe before loosening the process connections.
risk of injury due to the nature of the fluid.
• Respect the regulations on accident prevention and safety rela-
ting to the use of aggressive fluids.
If a pH/redox probe (with PG 13.5 head, 120 mm long
and without temperature probe) from a supplier other than
Bürkert is used, follow the relevant instructions on instal-
lation in the pipe.
Direction of the fluid
20
English
Type 8202/8222

Installation

Choose an appropriate position in the pipe to install the fitting.
Fit the pipe with a fitting with G 1" ½ external threaded sensor
connection with respect to the instructions delivered with the
fitting.
Fig. 11: Mounting positions of the 8202 in the pipe

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Element 8222

Table des Matières