Disassembly Of The Mechanics - E sky ECUREUIL XL Notice D'emploi

Hélicoptère électrique double rotor rc rtf
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

c) Disassembly of the Mechanics
First, unhook the linkage rods (1) from the paddle rod and
remove the two fastening screw (2) of the rotor shaft cap
(3). The rotor shaft cap and the paddle rod can then be
removed to the top.
Then remove all four rotor blades.
To prevent losing the rotor blade screws, you should turn
them into the blade holders slightly again after removing
the rotor blades.
When you have removed the two fastening screws (4) at
the end, the mechanics can be taken from the fuselage
downwards at the end.
Assembly of the mechanics is performed in reverse order.
Ensure that the rotor blades with the description "A" must
be installed to the upper and those with the description "B"
to the lower rotor head. Do not overtighten the rotor fastening
screws (also see figure 8).
Figure 24
61
07/10

Publicité

Table des Matières
loading

Table des Matières