Cleaning And Maintenance - Sime Murelle EV HE 30 Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ENG
FR
4.5
CLEANING AND
MAINTENANCE
Preventive maintenance and checking of
efficient operation of equipment and safety
devices must be carried out exclusively by
authorized technical personnel.
During maintenance operations the
authorised technician must check that
the syphened drip is full of water (this
check is of impor t ance par ticularly
whenthe generator has been out of use
for a long period of time). Filling is done
via the special opening (fig. 20).
38
ATTENTION
Before removing or refitting the front
panel of the boiler, open the small upper
plastic door.
Codice/Code 8109500
Modello/Model MURELLE EV HE 30 CND
Matricola/Serial n. 999999999
PAR 1 = 4 (G20) / 9 (G31)
PAR 2 = 5
Fig. 19
Fig. 20

Publicité

Chapitres

Table des Matières
loading

Table des Matières