1. Close the gas cock.
ENG
2. Disassemble the burner manifold (3).
3. Replace the main nozzles (6) supplied in
FR
a kit, inserting the copper washer (4).
Use a ø 7 wrench to perform this opera-
tion.
4. Remove the "METANO/GPL" connector
link on the card and set it in the posi-
tion corresponding to the gas to be
used (4 fig. 15).
5. To set the values of maximum and mini-
mum gas pressure, follow the instruc-
tions given in section 4.5. 1 .
6. After have ultimated the conversion of
the boiler, please stick onto the casing
panel the plate showing the relevant flue
which is included conversion kit.
NOTE: When reassembling components
which you have removed, replace gas
seals; test all gas connections after
assembly using soapy water or a product
made specifically for the purpose, being
sure not to use open flame.
4.4. 1
Adjusting valve pressure
Set maximum and minimum pressure on
gas valves as follows (fig. 22/a):
1.
Connect the column or a manometer
......then to raise
26
to the intake downstream of the gas
valve.
Disconnect the valve VENT pressure test
point tube (5 fig. 21).
2. Remove the cap (1) from the modula-
tor.
3. Place the hot tap water potentiometer
knob at the maximum position.
4. Turn on the boiler using the four-way
switch and turn on a hot water tap all
the way.
5. Remember that rotating clockwise will
increase pressure while rotating anti-
clockwise will diminish it.
6. Adjust maximum pressure using the
nut (3 fig. 22/a) with a wrench to the
maximum pressure value indicated in
Table 4.
7.
Do not adjust minimum pressure until
you have adjusted maximum pressure.
8. Turn off the supply power to the modu-
lator, and keep the hot water tap tur-
ned on.
9. Lock the nut (3) in place, turn the
screw /nut (2) to the minimum pres-
sure indicated in Table 4.
10. Turn off the boiler and turn it back on
again several times, keeping the hot
water tap turned on at all times and
checking that the maximum and mini-
1
mum pressure values correspond to
the established values; correct the set-
tings if necessary.
11. Adjust, checking that you have resto-
red the power to the modulator.
12. Put the pipe back on the valve VENT
pressure test point.
13. Remove the manometer, remembering
to tighten the screw for closing the
pressure test point.
14. Put the plastic cap (1) back on the
modulator and seal with a drop of
coloured sealant if necessary.
4.5
REMOVAL OF OUTER CASING
The casing may be removed completely to
facilitate boiler maintenance, as shown in
fig. 23.
4.6
CLEANING AND
MAINTENANCE
Carry out the cleaning of the generator in
the following way:
1. Unplug the power cord to the boiler and
close the gas feed cock.
2. Remove the outer casing and the gas
2
.......at last to pull
Before remove the five screws .......
Figure 23